Single and three phase service used for pumping from tailwater pumps and sprinklers.

Rate classes: 01-Single Phase Sprinklers  02-Three Phase Sprinklers, 03-Single Phase Tailwater Pumps, 04-Three Phase Tailwater Pumps

 

Single Phase

Three Phase

 

Customer charge

$20.00

$38.00

per month

Billing kVA

$0.90/kVA

$0.90/kVA

per month

Energy charge

0.10878

0.10878

per kWh

Annual minimum bill

Twelve times monthly customer charge Plus $10.80/kVA.

Irrigation  Single and three phase service used for water well pumping for irrigation purposes.

Rate classes: 05-Large Irrigation,  06-Single Phase Small Irrigation,  07-Three Phase Small Irrigation

 

Demand charge (March-Sept.)

 

$4.75

per kW

Demand charge (Oct.-Feb.)

 

$0.00

per kW

Customer charge

 

$1.65

per kVA per month

Energy charge

First 200 kWh per kW

$0.0702

per kWh

 

Next 200 kWh per kW

$0.0539

per kWh

 

Remaining kWH

$0.0413

per kWh

Minimum Bill

 

$19.80

per kVa

Three phase service,50 kVA or less, used for residential, farming, ranching, commercial, and public uses except those covered by a specific rate schedule.

Rate classes: 08-Three Phase Commercial, Farm & Home, All Electric, Water Wells; 09-Three Phase Grain Bins

Customer charge

$38.00

per month

Energy charge

$0.0960

per kWh

Minimum bill

$38.00

per month
+ $1.30 per kVA over 15 kVA

Farming, ranching, commercial, and public uses except those covered by a specific rate schedule.

Rate classes: 09G-Single Phase Grain bins, 11B-Barn, 14-Fence Chargers, 17-Water Wells, 13-Single Phase Small Commercial

Customer charge

 

$22.50

per month

Minimum Charge

 

$30.00

per month

Energy charge

First 1000 kwh

$0.0973

per kWh

 

Over 1000 KWH

$0.0823

per kWh

Rate Classes: 11 Farm & Home, 12-All Electric, 17R Residential Water Wells

Customer charge

 

$20.00

per month

Energy charge

First 1000 kWh

$0.0973

per kWh

 

Over 1000 kWh

$0.0823

per kWh

Commercial and Industrial use with greater than 50 kVA public uses except those covered by a specific rate schedule.

Rate class: 15-Large Power

Demand charge

 

$5.15

per kW

Customer charge

 

$112.00

per month

Energy charge

First 200 kWh per kW

$0.06762

per kWh

 

Next 200 kWh per kW

$0.05649

per kWh

 

Remaining kWH

$0.04556

per kWh

Other provisions

3 % discount of demand and energy for delivery of primary voltage (>7200 volts)

Minimum bill

$250.00 or $1.30/kVA  whichever is greater

50 kVA or less for the Purpose of extracting petroleum or related products from the earth.

Rate class: 16-Oil Well Pumping

Demand charge

 

$7.25

per kW

Customer charge

 

$60.00

per month

Energy charge

First 200 kWh per kW

$0.06912

per kWh

 

Next 200 kWh per kW

$0.05799

per kWh

 

Remaining kWH

$0.04556

per kWh

Minimum bill

Customer Charge Plus Demand or $1.30/kVA installed, whichever is greater

Availability
Available upon application to all Customers for outdoor lighting service at any point on or near the Cooperative’s lines where existing facilities have adequate capacity and suitable voltage.

Type of Service
Single-Phase service at the Cooperative’s standard secondary distribution voltages.

Monthly Rate
Each billing period the Member shall be obligated to pay the following charges:

Unmetered Monthly Rate

Unmetered

KWh per Month

Power Supply

Distribution

Total

 

175 Watt Mercury Vapor

70

$3.81

$5.94

$9.75

 

100 Watt HPS

50

$3.81

$5.94

$9.75

 

400 Watt Mercury Vapor

160

$8.71

$6.54

$15.25

 

250 Watt HPS

125

$8.71

$6.54

$15.25

 

1000 Watt Mercury Vapor

400

$21.77

$13.23

$35.00

 

400 Watt HPS

200

$21.77

$13.23

$35.00

 

Billing Adjustments:
These rates are subject to all applicable billing adjustments.

Conditions of Service:
Unmetered automatically controlled overhead lighting service operating from dusk to dawn. The Cooperative will install, own, operate, and maintain such lighting. Lights will be mounted on an existing service. Pole or poles and such service will be limited to 120-volt service.

In the event a member desires a light to be installed on a pole that will require the Cooperative to install an additional pole or poles and service wire, the member will be required to pay in advance as aid-to-construction the actual cost of all construction. No part of the extension will be borne by NPEC. A one-and-one half kVA transformer will be installed if required, at no additional cost.